 |
Water & Sewer
|
"I would like to convey my appreciation of The R-A-M
Professional Group services rendered to EG&G Florida
for on-call A&E support. The R-A-M Professional
Group has performed numerous water and sewer
system designs which have met targeted schedules
while satisfying user requirements and regulatory
compliance initiatives. RAM also provided
invaluable support and innovative guidance to
investigate long term treatment alternatives for
Kennedy Space Center Sewer treatment system." |
|
|
Ellen S. Feeney
Manager, Water & Waste Branch
EG&G Florida, Inc. / Kennedy Space Center |
|
"The R-A-M Professional Group, Inc. (RAM) has completed the three studies required for
renewal of our National Pollutant Discharge
Elimination System (NPDES) Permit. I am
very pleased with the quality of work on these
three reports. These NPDES permit
studies were thorough, accurate, and timely,
and I am very impressed with our consultants
for this project."
|
|
|
Donna Kaluzniak, C.E.P.
PCP Supervisor
City of Jacksonville Beach, FL |
back to top
Roadways
|
"US 17/Roosevelt Boulevard - 3R
Project Type of Work
Group - 3.1
Quality Grade - 92
Schedule Grade - 95
Management Grade - 91
Composite Grade - 92" |
|
|
Ken Scher, P. E.
Department Project Manager
Florida Department of Transportation |
|
"Repair Streets, Various Locations and
Repair Parking Lot, Building 5400
Design Phase or Engineering
Services
Outstanding - 6
Satisfactory - 4
Overall Rating - Above Average" |
|
|
Martin W. Bateman Officer in Charge of
Construction
Marine Corps Logistics Base, Albany, GA |
|
"Hartley Road (SR 13 to St. Augustine)
Quality Grade - 92
Schedule Grade - 95
Management Grade - 100
Composite Grade - 95" |
|
|
Douglas E. Layton, P. E.
Public Works Project Manager |
|
"Timucuan Multi-Use Trail
Quality Grade - 93
Schedule Grade - 95
Management Grade - 93
Composite Grade - 93.4" |
|
|
Eugene M. Hagan, Jr. P.E.
Public Works Project Manager |
back to top
Stormwater
|
"It is with a great deal of pleasure that I
offer this letter of recommendation for RAM.
The City of Atlantic Beach hired RAM to
complete a preliminary design on the Core City
Redesign / Tailwater Control. In their
Preliminary Design Report, they presented
innovative alternatives. RAM
consistently integrated well with both the
professional staff and elected officials of
Atlantic Beach, as well as a citizen oversight
committee." |
|
|
Hon. John Meserve
Mayor, City of Atlantic Beach |
|
"This is to certify that
RAM is a current supplier of
engineering and environmental services to FMC
Corporation. projects have been well
designed, properly managed and on time. We
highly recommend RAM and would not
hesitate to request further services from them
should the need arise."
|
|
|
E. Bertran, P.E.
Operations Support
Engineer
FMC Corporation |
back
to top
Site Development
|
"We have been blessed as a church to enjoy the
services of the R-A-M Group for the last few
years. Having 43 acres on the Trout River,
presented a myriad of planning and permitting
challenges. Everyone at the R-A-M Group gave
100% to our project and did everything possible
to insure a smooth on time completion.
Because of the environmental issues we faced, it
was mandatory that we be represented by a firm
who was well respected by the regulatory
agencies and the city of Jacksonville. Our
choice of the R-A-M Group proved to be a wise
one. In addition, our general contractor told me
that your set of engineering plans was one of
the best he had ever been presented. .
It would be my pleasure to recommend the
services of The R-A-M Professional Group to
anyone seeking a dynamic, responsive engineering
/ environmental consulting firm." |
|
|
Chris Coram
Associate Pastor for Administration and Finance
North Jacksonville Baptist Church |
|
"I would like to express my gratitude to your
firm for the unselfish support and excellent
professional design services provided to the
Jacksonville District in the preparation of
plans and specifications for the Port Mayaca
Lock Recreation Area. The civil designs
detailing, cost estimates, design analyses, and
presentations provided by your team were clear
and thorough on one of our first metric
projects." |
|
|
Edward E. Middleton, Ph.D., P.E.
Chief, Engineering Division
Department of the Army
Jacksonville District Corps of Engineers |
back
to top
Environmental Services
|
"The R-A-M Professional Group, Inc. did a
splendid job of helping The Florida Times-Union
negotiate with the Florida Department of
Environmental Protection on a groundwater
problem. If it were not for the knowledge
and skill of RAM's environmental team, we
undoubtedly would have incurred more cost and
wasted time." |
|
|
Robert E. Martin
General Manager
The Florida Times-Union |
|
"I believe that your assistance helped us
reduce some severe liabilities for ITT Community
Development Corporation and we appreciate your
superior understanding of the applicable rules
and regulations. To say the least, we are
extremely pleased with your work and that of
your staff, and believe that your level of
service exceeded our expectation every time..."
|
|
|
Frank Meeker, C.E.P.
Sr. Manager, Environmental
Affairs
ITT Community Development Corporation |
back
to top
Landscape Architecture
|
"As a City Council Representative, I have worked
with RAM on various park projects that included
master planning designing...During the master
plan process, their staff met all the deadlines
and remained very responsive to the concerns
originating from my office and our constituents.
Their approach to the park designing was user
friendly and inspiring...The R-A-M staff has
demonstrated the up-most professionalism at all
public workshops held by my office...Because of
their innovativeness this site will be a show
site used by the Life Station representatives.” |
|
|
Hon. Suzanne Jenkins
Councilwomen, District Four
Office of City Council
City of Jacksonville
|
|
“As a City Council
Representative, I have had the opportunity to
work with RAM on various park projects that
included master planning and designing...During
the master plan process, their staff met all
deadlines and remained very responsive to the
concerns originating from my office and our
constituents. Their approach to the park
designing was unique and innovative...ability to
work and relate to the public is
exceptional...express my sincere pleasure and
satisfaction with the RAM Professional Group,
Inc.” |
|
|
Hon. Lynette Self
Councilwoman, District Two
Office of City Council
City of Jacksonville |
|
"City of Jacksonville -
Miscellaneous Park Improvements
Quality Grade - 95.7
Schedule Grade - 100
Management Grade - 94
Composite Grade - 95.7" |
|
|
Maria C. Williams,
P.E.
Public Works Project Manager |
back to top
ID/IQ - Miscellaneous Services
|
"Florida Community College, North Campus, has
just completed a project with The R-A-M
Professional Group, Inc. and included the
development of a North Campus drainage study...
I was very impressed with their professionalism,
knowledge, and ability to relate to the College
staff and our needs. They truly listened
to their customers and were able to translate
our requests into the final designs... Overall,
I am very satisfied with our final product..." |
|
|
Charlotte B. Minter
Interim Campus President
Florida Community College at Jacksonville |
back
to top
|