VC Johnson Drainage Improvements

VC Johnson Drainage ImprovementsThis project, located west of 1-295, extends approximately one mile from Dunn Avenue to the north.  The prime objectives of the project were to reconstruct the roadway to current City rural section standards and develop an improved stormwater outfall system to eliminate stormwater flooding in the area.

Improvements include:

  • Construction documents
  • Widen road
  • Wetlands delineation
  • Paving design
  • Water/Sewer evaluation and design
  • Drainage stormwater design
  • Cost estimates
  • Signing and pavement markings

RAM’s responsibility included designing the reconstructed roadway, a new outfall system to accommodate capacity requirements and eliminate stormwater flooding in the area, including upstream and downstream improvements, relocated OH electrical, and associated permitting.

Year Completed:   2004 (Design)
Adherence to Schedule:  Construction Ahead of Schedule
Construction Cost Estimate: $2,800,000
RAM Contract:   $280,000

Professional Licenses

  • Engineering License: EC0006489
  • Landscape Architecture License: LC26000197

Contact Us

The R-A-M Professional Group, Inc.
8298 Bayberry Road, Suite 1
Jacksonville, Florida 32256
Telephone: 904-731-5440

Professional Associations