Ft. George Island Transportation Improvement Project
Significant data collection, master plan preparation, PD&E and 60% design (thus far) for transportation improvements of Ft. George Road and Palmetto Avenue for increased visitor attendance within Ft. George Island State Park while protecting significant existing environmental and historic resources. A new entrance is proposed bringing A1A traffic through Batten Island.
The roadway concept utilizes a boulevard system redirecting traffic though low impact areas while providing a multi-use/alternative transportation route for connection with the Ribault Clubhouse and the Kingsley Plantation. To protect the natural and historic resources, Low Impact Design (LID) drainage solutions with incorporated swales will virtually eliminate the need for retention ponds. Components include:
|
|
RAM’s responsibilities included, due diligence and data collection, master planning, engineering, landscape architecture, public participation, conceptual permitting, construction drawings; and extensive coordination with FDOT, FPS, and City of Jacksonville stakeholders.
- Year Completed: To Be Determined
- Construction Cost Estimate: $6,500,000
- RAM Contract $727,107