Ft. George Island Transportation Improvement Project

Ft. George IslandSignificant data collection, master plan preparation, PD&E and 60% design (thus far) for transportation improvements of Ft. George Road and Palmetto Avenue for increased visitor attendance within Ft. George Island State Park while protecting significant existing environmental and historic resources. A new entrance is proposed bringing A1A traffic through Batten Island.

The roadway concept utilizes a boulevard system redirecting traffic though low impact areas while providing a multi-use/alternative transportation route for connection with the Ribault Clubhouse and the Kingsley Plantation. To protect the natural and historic resources, Low Impact Design (LID) drainage solutions with incorporated swales will virtually eliminate the need for retention ponds. Components include:

  • Roadway design
  • Multi-use/alternative transportation route design
  • LID stormwater/drainage design
  • Landscaping
  • Traffic study
  • PD&E documents to satisfy N.E.PA requirements
  • Conceptual environmental permitting
  • Signage/marking plans

Ft. George IslandRAM’s responsibilities included, due diligence and data collection, master planning, engineering, landscape architecture, public participation, conceptual permitting, construction drawings; and extensive coordination with FDOT, FPS, and City of Jacksonville stakeholders.

  • Year Completed:   To Be Determined
  • Construction Cost Estimate: $6,500,000
  • RAM Contract   $727,107

Professional Licenses

  • Engineering License: EC0006489
  • Landscape Architecture License: LC26000197

Contact Us

The R-A-M Professional Group, Inc.
8298 Bayberry Road, Suite 1
Jacksonville, Florida 32256
Telephone: 904-731-5440

Professional Associations