Print

SR 15 / U.S. 17 Roosevelt Blvd.

SR 15 / US 17 Roosevelt BlvdSR 15/U.S. 17, a “3R” urban project, consisted of 0.86 miles  of 4-lane milling and resurfacing, utility adjustments, storm drainage rehabilitation, ADA requirement upgrades, signing and pavement markings, signalization, maintenance of traffic (from Wabash to St. Johns Avenue), and extensive coordination with property owners.  Included innovative solution (dual turn lanes) to long-term traffic problem at San Juan.  Project scored 92. 

Construction Cost:  $1,800,000
Design Fee:  $170,000

Print

S.R.9A / U.N.F. Drive Enhancement

U.N.F. Drive EnhancementThe S.R.9A / U.N.F. Drive Enhancement project is approximately 1.5 miles in length and extends between Butler and Beach Boulevards in Jacksonville. Project required close coordination between FDOT and UNF personnel and assistance with the development of a maintenance contract (MOA). Improvements include:

Print

SR 115 MLK Parkway

MLK ParkwaySR 115 (MLK Parkway) service roads, a “3R” urban project, consisted of 2.1 miles from the Matthews Bridge Interchange (SR 10A) to 17th Street.  Elements of work included service road resurfacing, limited mainline expressway resurfacing,

Contact Us

The R-A-M Professional Group, Inc.
8298 Bayberry Road, Suite 1
Jacksonville, Florida 32256
Telephone: 904-731-5440

Professional Licenses

  • Engineering License: EC0006489
  • Landscape Architecture License: LC26000197

Professional Associations